Log directory is not writable - please CHMOD e107_system/04502ba839/logs/ to 777
Path to logs: e107_system/04502ba839/logs/

Overview of Activities

action number
name of the action
responsible partner
brief description
Link Rowicon - link to another page
Photo Rowicon - link to photo gallery
Pdf Rowicon - available for download in .pdf format
Delive Rowicon - project deliverables Mileston Rowicon - milestones of the project
A.1
Quantitative and qualitative analysis, detailed interdisciplinary field reconnaissance in order to state precisely the threat to groundwater and ecosystems
ŠGÚDŠ
  • geological, hydrogeological and pedological maps at 1:5000 scale Pdf Rowicon
    • 3 GIS maps finished (1:5000) Pdf RowiconDeliver Rowicon
  • installation of 5 groundwater monitoring stations Photo RowiconMilestone Rowicon
    • results of groundwater monitoring Pdf Rowicon
  • installation of 5 air monitoring stations in the cave Photo RowiconMilestone Rowicon
    • results of air monitoring Pdf Rowicon
  • 600 analyses of water chemical composition basic parameters, ?18O and ?2H waters in and around of the cave
  • 200 tritium analyses of water in and around of the Krásnohorská jakyňa cave
  • 10 tracer tests in the cave system surroundings Pdf RowiconPhoto Rowicon Photo Rowicon
  • geophysical measurements of the underground and surface water flows
A.2
Spatial reconnaissance and spatial monitoring of groundwater quality
ŠGÚDŠ
  • 80 complete analysis of water chemical composition in and around Krásnohorská jaskyňa Cave according to the drinking water standards, together 8 sampling series at 10 sampling locations Photo Rowicon
  • Hydrogeochemical conditions / monitoring of groundwater quality (analyses & maps)
    • 8 maps of the water quality finished Pdf RowiconDeliver Rowicon
A.3
Water sampling and field measurements in the underground hydrological system in a daily time step
ŠGÚDŠ
  • ensuring the physical collection of 600 + 200 water samples from the underground hydrological system for A.1 activity
    • all samples taken and analysed Pdf RowiconDeliver Rowicon
A.4
Comprehensive assessment of the components of the underground landscape and defining of interactions between biotic and abiotic parts of an underground
landscape structure
ŠGÚDŠ
  • creation of a geographic information system on groundwater quality of the Krásnohorská jaskyňa Cave hydrological system reflecting its temporal changes
    • final report of the underground water system, GIS Pdf RowiconDeliver Rowicon
A.5
Preparatory activities for creation of the prototype device - technical drawings
ŠGÚDŠ
  • preparation of project documentations of prototype device on protection of water source from sudden deterioration in extreme flow situation
    • technical drawings of prototype finished Pdf RowiconDeliver Rowicon
A.6
Getting permission to install a prototype
ŠGÚDŠ
  • permission for the installation of a prototype device on protection of water source from sudden deterioration in extreme flow situation
    • permit issued Pdf RowiconDeliver Rowicon
A.7
Meetings with local residents in order to clarify the reason of the project and potential risks posed to the drinking water source for the village
OZ ENVI
  • Meetings with the citizens and private meeting with the mayor and members of the Krásnohorská Dlhá Lúka local council to explain the potential risks to water resources in the area
    • realization of activity A.7 Pdf RowiconDeliver Rowicon
B.1
Creating models of chemical composition development by water interaction with rock environment and the development of rainfall-runoff interactions in the rock environment
ŠGÚDŠ
  • model of the chemical composition development of the water by its interaction with rocks for the Krásnohorská jaskyňa Cave underground hydrological system Pdf RowiconDeliver Rowicon
  • model of transformation of precipitation to groundwater in the Krásnohorská jaskyňa Cave underground hydrological system Pdf RowiconDeliver Rowicon
B.2
Creation and testing of the prototype device protecting the source of drinking water supplying population of the Krásnohorská Dlhá Lúka municipality and its installation in continuous operation
ŠGÚDŠ
  • the establishment and testing of a prototype device protecting the source of drinking water Photo RowiconMilestone Rowicon
    • online water quality monitoring - online data from the prototype device Link Rowicon
B.3
Delineation of environmentally sensitive sites (hot spots) of surface anthropogenic activities interactions with the underground landscape system
ŠGÚDŠ
  • maps of "hot spots" - environmentally sensitive sites of surface anthropogenic activities interactions with underground landscape system of the cave at a scale of 1:5000 Pdf RowiconDeliver Rowicon
B.4
Developing rules of improvement or maintaining the status suitable for the protection of natural interaction of individual system components in the area of the Krásnohorská jaskyňa Cave, design of measures for improvement and maintaining the status
OZ ENVI
  • rules of improvement or maintaining the status suitable for the protection of natural interaction of individual system components Pdf RowiconDeliver Rowicon
  • illegal waste dump in the Krasnohorská Dlhá Lúka village – monitoring the current state Pdf Rowicon
  • illegal waste dump in the Krasnohorská Dlhá Lúka villag – proposal to remove illegal dump Pdf Rowicon
  • field trips - monitoring of the state of the environment Pdf Rowicon
  • discussion with the mayor of Krásnohorská Dlhá Lúka village Pdf Rowicon
B.5
Implementation of the proposed measures in agriculture and land use in the catchment area of the underground hydrologic system of the Krásnohorská jaskyňa Cave
ŠGÚDŠ
  • draft of measures in agriculture and land use practice in the catchment area of the underground hydrological system of the Krásnohorská jaskyňa Cave Pdf Rowicon Foto RowiconMilestone Rowicon
C.1
Monitoring of groundwater quality after installing the prototype and implementation of the measures
ŠGÚDŠ
  • database of monitoring results Link RowiconDeliver Rowicon
  • database of detailed temporal changes in the quality of karst water
  • database of detailed temporal changes of microclimate quality in the underground karst system
  • monitoring report Pdf RowiconDeliver Rowicon
C.2
Prototype operation monitoring - monitoring of functioning, unsoundness, resistance
ŠGÚDŠ
  • report about performance of prototype Pdf RowiconDeliver Rowicon – a report on the reliability of the prototype device on protection of water source from sudden deterioration in extreme flow situation
  • improved version of the prototype device...
C.3
Monitoring the impact of project activities and communication to change behaviour of inhabitants and land users in the surroundings of the cave
OZ ENVI
  • realization of activity C.3 Pdf RowiconDeliver Rowicon
  • field trips - monitoring of the state of the environment Pdf Rowicon
  • questionnaires: I. round, II. round, III. round and online questionnaire Pdf Rowicon
  • evaluation of questionnaires: I. round, II. round, III. round and online questionnaire Pdf Rowicon
C.4
Monitoring of the impact of the project activities on local urban development and municipal land-use behaviour
OZ ENVI
  • monitoring socio-economic indicators – report on local development and land use monitoring Pdf RowiconDeliver Rowicon
D.1
Milestone Rowicon Communication activities for the residents of the village Krásnohorská Dlhá Lúka to implement the proposed measures in agriculture and land-use
OZ ENVI
  • realization of activity D.1 Pdf Rowicon
  • promotional items - graphical design Pdf Rowicon
  • meeting with residents and visitors of the village at the Gastro-fest 2017 event Pdf Rowicon
  • communication activities - 2014 Pdf Rowicon
  • bilingual information leaflet Pdf RowiconDeliver Rowicon
D.2
Milestone Rowicon Communication activities for different target groups in Slovakia, to promote the project results - government, local government, professionals, general public, schools, speleologists
ŠGÚDŠ
  • 2 popular leaflets Pdf RowiconDeliver Rowicon
  • 2 short publications - brochures Pdf RowiconDeliver Rowicon
  • 5 scientific articles Pdf RowiconDeliver Rowicon
  • field trip for representatives of environmental authorities and water management authorities from regions adjacent to the project area Photo Rowicon Pdf Rowicon
D.3
Project website
ŠGÚDŠ
  • ongoing and maintained website of project activities and project result Link RowiconDeliver Rowicon
D.4
Laymans Report - report of the project for general public
ŠGÚDŠ
  • Layman's report on the project in two languages (Slovak and English) in 200 copies Pdf RowiconDeliver Rowicon
D.5
Media activities - articles, press releases, radio inputs
ŠGÚDŠ
  • 3 popular articles in popular science magazines and educational magazines Pdf RowiconDeliver Rowicon
  • 3 communication activities in the public media Link RowiconMilestone Rowicon
  • 5 press releases Pdf RowiconDeliver Rowicon
D.6
Installation of information boards
OZ ENVI
  • realization of activity D.6 Pdf Rowicon
  • installation of information boards Pdf RowiconMilestone Rowicon
  • information boards on the KRASCAVE project:
    • Information board titled as "We can’t survive without water..." installed in the Krásnohorská Dlhá Lúka village Pdf Rowicon Photo Rowicon
    • Information board titled as "Clean karst for fresh water" installed in the Krasnohorská Dlhá Lúka village Pdf Rowicon Photo Rowicon
    • Information board about the project KRASCAVE installed in the Krasnohorská Dlhá Lúka village Pdf Rowicon Photo Rowicon
    • Information board about the project KRASCAVE installed in the premises of the Slovak geological institute of Dionýz Štúr in Bratislava Pdf Rowicon Photo Rowicon
D.7
Participation at the kick-off meeting
ŠGÚDŠ
  • participation on the kick-off meeting organized by the European Commission Pdf RowiconMilestone Rowicon
D.8
Post-project communication
ŠGÚDŠ
  • 2 scientific and professional articles on the topic of work carried out in the project
  • 2 meetings with stakeholders with economic activities in the area
  • 2 meetings with children and young people living in Krásnohorská Dlhá Lúka municipality
  • post-project communication plan Pdf RowiconDeliver Rowicon
E.1
Project management
ŠGÚDŠ
OZ ENVI
  • meetings of project management and principal investigators
  • meetings of the Steering Committee Pdf RowiconPhoto RowiconMilestone Rowicon
E.2
Monitoring of project progress
ŠGÚDŠ
  • Inception Report Pdf Rowicon
  • Mid-term Report (with payment request) Pdf Rowicon
  • 1st Progress Report Pdf Rowicon
  • 2nd Progress Report Pdf Rowicon
  • Final report Pdf Rowicon
E.3
Project audit
ŠGÚDŠ
  • the audit report of the project Deliver Rowicon
E.4
Networking with other LIFE projects in similar areas - at both national and international level
ŠGÚDŠ
  • 2 meetings with investigators of similar LIFE+ projects
  • links and references on similar LIFE+ projects Link RowiconMilestone Rowicon

0/5 : Not rated